Cancel/ Change Order Policy
• Overview of Our Order Adjustment Policy
- At Povawhat, we understand that customers may sometimes need to change or cancel an order shortly after placing it.
- Because many of our products involve customization, personalized details, or fast-moving production workflows, we created a balanced system that protects both customer flexibility and production efficiency.
- The goal is to give you enough time to correct mistakes, while ensuring orders are not delayed or disrupted once production starts.
- Everything below is designed to be simple, direct, and easy to follow, so you always know what to expect when requesting a change or cancellation.
• Our 4-Hour Flexibility Window (Important)
- Customers have a strict 4-hour window after placing an order to request any type of modification or cancellation.
- This is the only timeframe in which changes are possible because orders begin moving through a series of automated and manual production steps immediately after this period.
- During these first 4 hours, the order is held briefly to allow customers to review and correct information if needed.
- After 4 hours, the system automatically releases the order into production, where it becomes locked and cannot be altered in any way.
What You Can Change Within 4 Hours:
- Change of size (e.g., M → L)
- Change of color or style
- Correction of custom text or personalization
- Replacing uploaded images or design files
- Changing product type or quantity
- Canceling the entire order
- Updating the shipping address
Why the 4-Hour Window Is Strict:
- Production preparation begins right after the holding period. This includes:
- Reviewing design files for accuracy and compatibility
- Preparing printing settings or engraving instructions
- Allocating specific materials, sizes, and inventory
- Scheduling your order in the production queue
- Once these processes begin, canceling or modifying the order would disrupt the system, cause delays, or waste allocated materials.
- For this reason, the 4-hour policy is firm and applies to all customers equally.
• Requesting a Change or Cancellation (Within 4 Hours)
- If you need a modification or cancellation, it is essential to act quickly.
- The fastest and most reliable communication method is email, as it allows our team to identify and prioritize urgent requests.
How to Request a Change Properly:
- Send an email to support@povawhat.com immediately.
- Use this exact subject line format for speed:
- “URGENT: Order [Your Order Number] Change/Cancellation”
- In your message, include the following:
- Your full name
- Email used at checkout
- Order number
- Description of the change you need (be as clear and specific as possible)
Examples of Clear Requests:
- “Please change the shirt size from L to XL.”
- “Please cancel my entire order.”
- “Please update the shipping address to: [new address].”
- “I uploaded the wrong image—please replace it with the attached file.”
Alternative Contact Method:
- You may also use the Contact Us page on our website, but email remains the quickest way for urgent requests.
- Requests submitted outside of the 4-hour window will be declined because the order will have already entered production.
• No Changes Allowed After 4 Hours
- Once the flexibility period ends, the order becomes final.
- At this stage, Povawhat cannot accept requests involving:
- Size changes
- Color or design adjustments
- Custom text corrections
- Replacement of uploaded files
- Order cancellation
- Address changes
- We understand that this can be frustrating if details were overlooked, but this rule allows us to maintain fast processing times and ensure fairness to all customers.
• Customer Responsibility for Address Accuracy
- The customer is fully responsible for entering complete and correct address details at checkout.
- This includes verifying the following fields:
- Street number and street name
- Apartment, suite, or unit number
- City, state, and ZIP code
- Proper spelling of all information
- Ensure the address is recognized by major carriers such as USPS, UPS, FedEx, or DHL
- Even small errors—missing digits, incorrect ZIP code, or omitted apartment numbers—can cause delivery delays or failures.
• Consequences of Incorrect Address Information
- If the courier cannot deliver the package due to an incorrect or incomplete address, the customer will be responsible for any re-shipment costs.
- Examples of issues caused by incorrect addresses include:
- “Insufficient address”
- “Address unknown”
- “Unable to deliver – no unit number provided”
- “Recipient moved”
- If the order is returned to us, we will contact you to arrange a new shipment. Shipping fees will apply.
If the Package Is Delivered to the Wrong Address Entered by the Customer:
- If tracking shows that the package was delivered to the address provided at checkout, Povawhat is not responsible for replacement or refund.
- We cannot retrieve or redirect the package once the courier completes delivery.
- In these cases, the order is considered fulfilled.
• Customer Support Information
- Our support team is here to help you navigate order changes, delivery concerns, or inquiries about your purchase.
- For assistance—especially urgent requests—please reach out using our primary contact method:
- Email: support@povawhat.com
- Physical business address for reference or documentation:
- Povawhat LLC
- 30010 SW 145th Ct, Homestead, FL 33033, United States
• Final Notes
- This policy is designed to ensure fairness, consistency, and efficiency for all customers.
- Acting quickly and double-checking details during checkout helps prevent issues later.
- Thank you for choosing Povawhat—we appreciate your trust and are committed to providing a reliable and smooth shopping experience.